Torontonians walk a street that does not exist yet: Waterfront Toronto lays out the future Ookwemin Street at full size
Community · Toronto · The Canadian Chronicle
Published Monday, November 23, 2026 · 3 min read
At a glance
- Waterfront Toronto held its 'Sharing the Street' workshop at Evergreen Brick Works on Sunday, November 22, 2026, in three sessions at the CRH Gallery, 550 Bayview Avenue.
- Residents walked and rolled through a life-sized mock-up of part of the planned Ookwemin Street, testing its width, plantings, cycling lanes and seating, and gave the design team feedback before the design is finalised.
- Ookwemin Street is planned for Ookwemin Minising, the new neighbourhood being built in Toronto's Port Lands. No attendance report for Sunday's sessions had been published by the time of this edition.
The street does not exist yet. On Sunday, Torontonians walked it anyway — at full size, indoors, with the design team taking notes.
Waterfront Toronto ran its “Sharing the Street” workshop at Evergreen Brick Works on Sunday, built around a life-sized mock-up of part of Ookwemin Street. Ookwemin Street is planned as a street in Ookwemin Minising, the new neighbourhood being built in the Port Lands, on the land the Don River's new mouth has opened up.
The workshop ran in three sessions at the CRH Gallery, at 550 Bayview Avenue: 10 a.m. to noon, 1:30 to 3:30 p.m., and 4:30 to 6:30 p.m. A free shuttle ran from Broadview Station every 30 to 45 minutes.
Walking the plan
The point of building a street at full scale before building it for real is that widths stop being numbers. Residents could walk or roll through the mock-up and test the street the way they will actually use it: how wide the sidewalks feel, where the plantings sit, how the cycling lanes run, and where the seating goes.
The feedback goes to the design team while the design can still change. That is the stage the Port Lands streets are at — drawn, consulted on, and not yet final — and it is the stage at which a resident's objection costs a pencil line instead of a construction season.
Waterfront Toronto advertised the sessions in advance, with registration required by November 20. No attendance report for Sunday's sessions had been published by the time of this edition, and the Chronicle does not invent one: what is verified is the programme itself — three sessions, a full-scale street, and a standing invitation for the people who will live with the result to walk it first.
Why it matters beyond one street
Ookwemin Minising is one of the largest new neighbourhoods Toronto will build this generation, on land that was industrial for a century. Its streets are being designed now, in rooms like Sunday's, before a single resident moves in.
The decisions taken at this stage — how much of the street belongs to cars, to bicycles, to trees and to people on foot — will be walked by thousands of people every day for decades. Sunday's workshop was the public's turn inside that process, at the one moment when the street is still easy to change.
Sources
- Waterfront Toronto, November 2026 — 'Sharing the Street' workshop invitation (Evergreen Brick Works, November 22, 2026)
- Canary District Neighbourhood Association, November 2026 — November news (workshop listing)
- Association of Ontario Land Economists, November 2026 — Sharing the Street notice
